01
Inspection
We walk the roof, check the attic from inside, and photograph the flashing, valleys, and decking. You get a written report with the problem areas marked and a recommendation: repair, restore, or replace. Takes about 60 to 90 minutes on an average home.
02
Written estimate
You get a line-item scope within 24 hours: squares, shingle brand and line, underlayment, ice and water shield, flashing, vents, tear-off, dumpster, and labor. We note what would change the price, like rotted decking or a second layer to strip.
03
Material delivery and prep
Materials land the day before or the morning of. We tarp landscaping, set ladder stabilizers, and stage the dumpster where it will not block your driveway. You meet the crew lead, who stays on site for the whole job.
04
Tear-off and install
We strip to the deck, replace any soft sheathing, then run ice and water shield, underlayment, drip edge, and field shingles. Ridge vents and flashing go on last. A standard 20-square ranch is a one-day tear-off and a one-day install.
05
Cleanup and final walk
We magnet-sweep the lawn and driveway twice, blow out the gutters, and walk the roof with you. You get the manufacturer's warranty paperwork, our workmanship warranty, and photos of the finished assembly before we pull out.